Impact Hub Belgrade / URED architecture studio

Impact Hub Belgrade  / URED architecture studio - Image 2 of 28Impact Hub Belgrade  / URED architecture studio - Image 3 of 28Impact Hub Belgrade  / URED architecture studio - Image 4 of 28Impact Hub Belgrade  / URED architecture studio - Image 5 of 28Impact Hub Belgrade  / URED architecture studio - More Images+ 23

  • Architects In Charge: Bojana Marković, Nikola Milanović, David Bilobrk, Ivana Jevremović, Hristina Stojanović
  • Project Team: Creative office space
  • Original Project Year: 1928
  • Original Design: Dimitrije M. Leko
  • City: Beograd
  • Country: Serbia
More SpecsLess Specs
Impact Hub Belgrade  / URED architecture studio - Image 11 of 28
© Relja Ivanić

Text description provided by the architects. Impact Hub Belgrade is a creative office space created through an adaptation and interior space renovation of the Events Hall in the former house of the headquarters of the Association of State Employees Purchasing Cooperatives.

Impact Hub Belgrade  / URED architecture studio - Image 9 of 28
© Relja Ivanić

The construction of the building took place from mid-1928 until mid-1929 and was done according to the second-prize design of the architect Dimitrije M. Leko, one of the most important and staunchest representatives of academic art in Serbian interwar architecture. The building is considered to be a part of Serbian cultural heritage, which affirms its exceptionality and artistic, cultural and social significance. Thus preserving the authentic elements of the interior is one of the main characteristics of this project.

Impact Hub Belgrade  / URED architecture studio - Image 17 of 28
Section BB

The basilica-shaped two-floor main hall is divided into three aisles with two colonnades and is covered with a vault. Considering the functional requirements, the space was re-organized so that the lower level consists of four offices, two meeting rooms, two Skype booths, kitchen and toilets - all grouped around a central nave that works as a co-working space. A steel plug-in frame extends the level of lateral galleries, central gallery and stairs, forming an adequate working space and a conference room. The top level provides access to the terrace, which serves as a working space and a space for socializing during the summer.

Impact Hub Belgrade  / URED architecture studio - Image 5 of 28
© Relja Ivanić

The intention was to create a contrast between what is new and what has been originally constructed. Some elements such as doors and windows, wooden paneling, gallery fence, decorative plastic on the capitals of the columns and pilasters date from the 1929. On the other hand, the staircase treads, made of wood and marble, indicate the time (1949-2014) when this place was used for Studio 10, Radio Beograd, as a hot spot for recording timeless radio-dramas.

Impact Hub Belgrade  / URED architecture studio - Image 26 of 28
Axonometric

Considering the previous use of space, it is of great importance to regard the Impact Hub community as a new global co-operative that encourages entrepreneurship development. Therefore, the main characteristics of the project rely on the aspects of functional continuity as one of the most important principles of revitalization.

Impact Hub Belgrade  / URED architecture studio - Image 4 of 28
© Relja Ivanić

Desks

Within the project, URED architecture studio has designed a special working desk, which is functional, economical and suitable for the Impact Hub concept. The original design offers a folding table with minimum dimensions, easy to store and transport. According to the users’ needs, trapezoidal shaped workspace becomes a module for a large number of different combinations. The intention was to enable users to be more focused on each other, but at the same time to have enough privacy with possible positioning of their computers.

Impact Hub Belgrade  / URED architecture studio - Image 3 of 28
© Relja Ivanić

Written by Nebojša Antešević

Project gallery

See allShow less

Project location

Address:21 Makedonska, Beograd, Serbia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Impact Hub Belgrade / URED architecture studio" 11 May 2015. ArchDaily. Accessed . <https://www.archdaily.com/627398/impact-hub-belgrade-ured-architecture-studio> ISSN 0719-8884

© Relja Ivanić

贝尔格莱德办公中心/ URED architecture studio

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.